Sunday, January 14, 2007

Siding and Insultation Prep

Here's a few pictures of the exterior siding now that the first course is finished around the entire house. The top picture is the east end of the house and the second one is the master bedroom window.


Below is the south side with the first course of siding on. If you look closely, you can see where Kenny has cut the siding and installed the exterior outlet box near the front door. There will also be a hose bib in that location as well. The spray foam installer couldn't make it this week, so he will be applying the insulation on Wednesday this coming week. The picture below is of the interior of the house as we prepare for insulation. We've taped off and covered the floor in the areas that receive insulation.
 Posted by Picasa

No comments:

Post a Comment