Above, you can see gravel is finished and two courses of the Insulated Concrete Foundation system is in place (now it really looks like a pool to me!). The bottom rows of ICF were placed so the plumbers can establish where the sub-slab plumbing needs to go. Below, you can see how the gravel was shot into the hole - pretty cool ay? (I'm not sure why these pics keep loading in the wrong order!) By the way, these are some nice pics and camera angles, Kenny. Good work!
Above, the plumber and his assistants place the sub-slab plumbing. The pic below shows the plumbing almost ready for inspection. The bottom pic should actually be at the top, since it's before the ICF forms were placed - as I said, I can't figure out how to get these to load in order. Oh well.
Friday, June 2, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment