Today has been a crazy day. First, the inspector arrived to do our follow-up inspection. As you can see from the blue tag below, we passed! We are ready for drywall.
Just as the inspector was leaving, the spray foam insulation contractor arrived. (These pics are out of order, as usual). Below is the spray foam being applied to the stair wall.Here's a few of the loft being sprayed.
A plug for them . . .
The spray foam guys (Pure Seal) arrived from Cleveland at about 1:00 pm today. After some time for maneuvering the driveway and setting up, they began taping off and spraying. They estimated two days for the job, but we just went up to the house to check on them and they told Kenny that they were trying very hard to finish up tonight. It's about 5:20 pm now and they were finished with the second floor, but still had the main floor and some high parts of the stair wall and great room to do. I'll be quite impressed if they finish tonight, but hey, they're young so who knows? Kenny's there supervising, of course :)
The drywall guy called and said he'll start on Tuesday. We're going to focus our efforts outside on garage siding this weekend as long as the weather is tolerable.
No comments:
Post a Comment