Monday, March 5, 2007

Let there be Light . . .

Today Kenny was able to hook up our first switched lights in the house. The basement circuits are connected to the breaker panel so we now have lights and power in the basement. He also hooked up the GFI outlet for our whirlpool tub in the Master Bedroom and the breaker for one of the furnaces. I gave a tour to a group of 21 college students this morning (I'll post pictures as soon as I get them). Above, the Master Bedroom is primed and ready for paint, and below is the first ceiling light in the basement!
The breaker panel - only 30-something more breakers to go!
 Posted by Picasa

No comments:

Post a Comment